In many houses, the floor is made of geepboard by lags. When walking, it begins, so the proper laying of the tile or porcelain stoneware on the wooden floor becomes not a simple task. In this chass, we will tell how to put a tile on the wooden floor and which ways to prepare the basis.

Unlike wood, the tile has several advantages. Its qualities are perfectly suitable for use in the corridor, kitchen, bathroom and toilet. Tile:

  • does not ignore;
  • not toxic;
  • not afraid of contact with chemical solutions;
  • withstands heavy loads;
  • does not conduct electrical current;
  • does not lose the appearance of moisture, sun rays or frost;
  • ceramics is unpretentious in cleaning.

The main lack of tiles is a cold surface, so the barefoot will be not very nice. To get rid of it, warm floors often use. Install even on a wooden base.

Stacking process


Installation of tiles is designed for a solid and rigid surface. Therefore, first need to examine the existing floor.

As a rule, old floors consist of several layers:

  • coating (laminate, linoleum, parquet, painting);
  • substrate (chipboard, board, plywood), which is fixed on lags;
  • Lags that lie on the concrete base along the entire floor with an interval of about 50 cm - they serve as a frame of construction.

Preparation of wooden floor

First option

Suitable for those who begged.


Second option

Suitable for those who have sex in poor condition, but conditions allow you to make a screed.


  1. Remove the old floor trim. So that the moisture does not penetrate inside, waterproofing of the wooden floor under the tile is carried out.
    The easiest way to waterproofing is the use of a plastic film.
  2. Using a laser or water level, make the markup of the horizontal floor line along the perimeter of the room.
  3. At a distance of approximately 1 meter from each other and about 10 centimeters from the walls, install beacons. To do this, use metal profiles, flexing them to the concrete of dowels.
  4. The screed is made either with a mortar from cement and sand (Composition: 1 part of cement M-400 on 3 pieces of sand), or by cast concrete.
  5. The average consumption will be approximately 15 kg per square. Meter at a layer of 1 cm.
  6. If you need to pour too much layer, then you first pour out the clayzit between the lighthouses, 2/3 of the thickness of the layer. Pour the screed and wait for drying during the day.
  7. After drying, clean the surface from the pop-up clay. Straighten and pour with solution. This time you need to align it by the Rule of Lighthouses so that the floor turns out to be smooth. Start alignment from a long corner to the exit.
  8. After three days, boil the screed and preferably pour by self-leveling solution.
  9. Everything! The screed is ready - now boldly proceed to ordinary methods.

Third option

Suitable for those who have the floor in good condition and will be covered with chipboard sheets.

  1. The slots between the wall and the tree are waterproof by the mounting foam.
  2. Impress chipboard several times with a protective impregnation or preheated oliff (be careful, it is flammable).
  3. Then apply a thick layer of latex on the surface of the chipboard.
  4. Immediately after applying it, put a paint grid on the surface, and leave up to dry.
  5. When the latex dries, the grid must be fixed with self-stairs to the floor.
  6. Treat the surface with a mixture of the following composition: 1 part of water, 2 parts of liquid glass, 2 parts of large sand.
  7. It is desirable to further align the surface with a self-confined solution. When everything dries, a tile is stacked on the wooden floor.

Video on laying tiles on the wooden floor in the apartment:

That's all the basic methods, how to put ceramic tiles on the wooden floor. As you can see, this is not a lungs that will require a lot of additional training. And if you put the tile directly on the tree, the tile will quickly crack and fall off due to a constant movement.